Keys: 0–9 + − × / $ % Enter Backspace Esc clears
Quick Square-Up (feet + inches)
Templates
Takeoff Items
Job Summary
Materials List — unit prices editable
| Item | Qty | Unit | Unit $ | Total $ |
|---|
Extras / Equipment / Other Trades
Scissor lift, scaffold, dumpster, delivery, acoustical ceiling, FRP, doors — anything not auto-computed.
| Description | Qty | Unit | Unit $ | Total $ |
|---|
Labor — production rates & wages editable
| Activity | Quantity | Prod (sqft/MH) | Man-Hours | Wage $/hr | Cost $ |
|---|
MH = quantity ÷ production rate. Burden % (workers’ comp, payroll tax, insurance) is applied in the Summary. Taping man-hours are weighted by finish level (L1 ≈ 0.35× … L5 ≈ 1.4× of a Level 4).
Cost Build-Up
Internal (not on proposal)
Payment Schedule
Terms max Net 15. Materials deposit due to start.
Unit Metrics
Scope Notes
Drywall Sheets
Metal / Wood Stud Framing
Ceiling Grid & Insulation
Square Footage / Linear Footage
Feet–Inch–Fraction Math
Type 12' 6 1/2" or 12.5 or 150". Add, subtract, or multiply by a count. Results to the nearest 1/16".
Unit Conversions
Job Info
Estimating Settings
Openings: each door deducts 21 sqft and each window 15 sqft of face area per side, and adds 2 framing studs and trim bead. Autosaves in this browser. Export JSON to back up or move a job. Client proposals show the client-facing markup only.
Payment (max Net 15)
Terms cannot be set past Net 15. Deposit is a percentage of materials plus sales tax, due to start.
Job Files
On iPhone: Share → Add to Home Screen. On other devices, use the browser Install option. The app then works offline.